Structured cabling system

The structured cabling system (SCS) is the basis of the building infrastructure, consisting of a set of communication cables and switching equipment, which allows combining various information services into a single system: telephony, local area networks, security system, etc.

DIT offers a range of services for the design, installation, commissioning and maintenance of cable systems.

Structured cabling system

SCS for office: advantages

Economy

Economy

Reducing the cost and installation time of systems, since the laying of the entire SCS can be done on a turnkey basis.

Independence

Independence

No dependence on changes in technologies and suppliers of active equipment.

Reliability

Reliability

The operating parameters are stored in the specified ranges throughout the entire service life.

Flexibility

Flexibility

Configuration changes and extensions are possible without replacing the entire existing network.

Versatility

Versatility

Unified cable system for data, voice and video transmission.

Long service life

Long service life

Long service life, justifying investment (20+ years).

Our projects: structured cabling systems (SCS)

Mounting of SCS

Replacement of a cross connect cabinet for REHAU company

The task was to replace the cross-connect cabinet with a smaller cabinet, transfer and organize the correct wiring and equipment placement in the new cabinet. Due to the large size of the old cross-connect cabinet and its unfortunate location, as well as due to inaccurate laying of the wire inside the cabinet, the customer experienced malfunctions in the operation of this switching unit. In the process of solving this problem, we installed and transferred the equipment of the old cabinet to a new cross-connect cabinet that is more compact. A router is installed and wire and patch cords are laid with the help of cable organizers. The work was done after the end of the working hours of the office staff, so as not to interrupt the work process during the day.
Mounting of SCS

SCS equipment for the “National” company

We had to clean the old SCS wires into boxes and terminate with sockets, where necessary. In addition, it was necessary to install and bring the SCS wires into a cross-connect cabinet, mount a router, an uninterruptible power supply and two patch panels in the cabinet, as well as install a closer on the door. In the course of work, we installed the above equipment, laid a box and laid SCS wires in it, and mounted low-voltage sockets on the base of the box. By laying the wires in boxes and bringing them into a cross-connect cabinet, we not only saved them from mechanical damage, but also gave an aesthetic appearance to the entire SCS system. The work was completed within 2 working days.
Mounting of SCS

Transfer of ACS and installation of SCS for “Platon Group” company

Dismantling the ACS of the old office and transferring the system to the new office. Office electrification, SCS laying. In the process of starting work, it turned out that the scope of work is increasing every day our engineers spend at the customer's site. The number of gates, electrical outlets and lamps has increased. The work was complicated by the fact that the customer's new office was located on the first floor of an apartment building, so the time for noisy work was limited by law. Despite the difficulties, our engineers installed the SCS in a box, in the premises specified by the customer, and installed a Wi-Fi router in the overhead space. Work was done on wall chasing and drilling holes in the walls for electrical outlets. The power supply wires of the office were laid along the grooved channels, the electrical panel was installed and disconnected, and the lamps were installed. Two doors were equipped with a biometric ACS system with an electromagnetic lock and an electric latch. Intercom and calling panels were installed. Two video cameras were installed inside the office. Despite the significantly increased volume of work in the process of fulfilling this application, the work was completed promptly and efficiently.
Mounting of SCS

Laying SCS in the new office

In a short time, with the help of our partners, we laid from the low-current cabinet of the RJ45 socket to each customer's workplace. The laying was carried out in plastic cable channels. The work was completed in two working days. The customer was satisfied with the work performed and promised to contact us in the presence of the following similar tasks.
Mounting of SCS

Installation of Cisco and SCS laying

The task was to install 17 Cisco access points on the territory of the customer's office, lay the SCS and cross the wires on two floors, in cross-connect cabinets. In a short time, according to the request of the customer, all cable routes were laid behind the false ceiling of the office. Access points are installed according to previously produced radio intelligence and a report on their optimal installation. When accepting the work performed, the following executive documentation was handed over to the customer, namely a cable log with the lengths and terminal elements of all laid routes. All works were carried out qualitatively and on time, the customer was satisfied.
Workplaces equipment

Workplaces equipment for “Hexa” company

Because of the expansion of the customer's office, it was necessary to install an additional 32 workplaces for employees on another floor of the same building. In a short time, at the time of finishing the premises, 64 twisted-pair wires were laid to the workplaces of the office employees. An interstorey 25-pair telephone cable was carefully laid for analog telephone communication of office employees with the central automatic telephone exchange. Also, each workplace was equipped with two power outlets. All the wires were neatly placed in boxes, sockets for desktops were placed in the same boxes. All wires were centralized in a low-voltage hanging cabinet and embroidered on patch panels. The customer was satisfied with the work performed and promised to contact us in the presence of the following similar tasks.
Workplaces equipment

Installing an access point and low-voltage RJ 45 sockets

The task was to install access points and low-current RJ 45 sockets on the territory of the customer's warehouse. In total, it was necessary to lay 63 twisted-pair wires and connect them to a low-current cabinet. The ceiling height of the warehouse was about 12 meters. In a short time, according to the request of the customer, we laid all cable routes at a height of 12 meters, installed the access points provided by the customer and installed RJ 45 sockets in the places indicated by the customer. In addition, we purchased and installed a low-current cabinet and connected all the wires from the sockets in it and access points.

What is included in the installation service a turnkey cable system

DIT specialists will install SCS for any request. Stages of work:
1

Designing

Departure of specialists to the facility for visual inspection and approval of equipment installation sites, as well as obtaining technical specifications.

2

Supply of equipment

Selection of equipment and related materials. Delivery to the facility. Quality control.

3

Installation and setup

Assembly and installation. Commissioning works. Putting into operation.

4

Technical maintenance

Maintenance of the system during the entire life of its operation.

The key principle of SCS is the integration of computing, telephone networks, video surveillance and security systems, television networks and fire and security alarm cables into a single system.

The structure of the structured cabling system includes:

  • telecommunication sockets;
  • main cross;
  • cable-backbone subsystem;
  • horizontal intermediate crosses;
  • consolidation points;
  • optical elements and others.

After installation, all components of the system are combined into a common information complex.

 

Features of SCS installation

Proper installation of the SCS ensures the interaction of several generations of hardware network equipment. In addition, structured cable networks must have high bandwidth and capacity for the introduction of additional devices and equipment.

The principle of modular construction of the SCS provides rapid localization of malfunctions and in the further process of operation, this makes it easy to monitor the condition of the SCS nodes and promptly eliminate the development of emergency situations.

An important point for building a structured cable network is the rational use of equipment and components. This can be achieved by drawing up a competent scheme-a building infrastructure project, on which the optimal location of cable routes, cross-country fields, etc. is calculated.

A special role is played by the experience of specialists in the installation of low-current networks. DIT employs leading specialists who are able to create a cable network of any complexity and fulfill all the wishes of the customer.

Book a call and we will contact you as soon as possible

Book a call and we will contact you as soon as possible

Phone
  • Please fill in this field.

Cisco
Legrand
Hyperline
BELDEN
Eurolan
D-link
Rexant
APC
ITK

Contact us

Any questions? Book a call!

Callback